Architect: Aedas, with HDR serving as project architects
Contractor: Sixco-Samsung (Joint Venture)
The Project
Cleveland Clinic Abu Dhabi is a 52.8 acre (2.3 million sq. ft.) facility with five clinical floors, three diagnostic and treatment levels and 13 floors of critical and acute inpatient units. This 364 (expandable to 490) bed facility is a unique and unparalleled extension of US based Cleveland Clinic Model of Care, providing direct access to the world’s best healthcare, reducing the need for patients in the region to travel abroad for treatment. It is currently one of the largest healthcare facilities in the Middle East.
JointMaster Expansion Joint Systems Installed
5,800 total meters (3.6 miles) of the following joint systems
– AR 300 Compression Seal
– 114 Series Drywall Wall+Ceiling Expansion Joint Covers
– 501 Series Pop-Up Pan Expansion Joint Cover System
– 615 Series Flush Mount Exterior Seal System
– 661 Series Curb Mounted Centering Bar Exterior Joint (Roof to Roof)
– 300 Series Glide Plate Wall & Ceiling Expansion Joint Covers
– 1100 Series Foam Seal
– 1150 Series Foam Seal
– 806 Series Floor Expansion Joint Covers
IPC® Door + Wall Protection Products Installed
– 800 Handrail
– 700 Wall Guard
– Rigid Vinyl Sheet